Exterior Drone View of Construction - July 2015

Interior Drone View of Construction - May 2015

Views Provided by Daniel O'Connell's Sons

July Project Update

Click for larger view

Latest Panoramic Views

6/15 - View from track-side showing the retaining wall to the left and the terminal building on the right.
7/15 - 3rd floor interior, view from the north wall.

Springfield Union Station Presentation and Video

3/24/2015 - Click the image above to view the presentation (requires PowerPoint)
3/24/2015 - Click the image above to view the video

About Springfield Union Station

This $84.5 million project will integrate multiple transit modes in one convenient, functional and attractive mixed-used complex that includes not only a regionally significant transportation facility but also third-party tenants.

Now under preliminary construction, Springfield Union Station will include:

  • The complete renovation of the Terminal Building and its central concourse to support ticketing, waiting and support areas for Amtrak, intercity and state-supported regional rail service as well as regional PVTA and intercity bus operations.
  • The renovation and reactivation of the Amtrak passenger tunnel linking the terminal building to train platforms and the adjacent downtown area.
  • Demolition of the former baggage handling building and construction of a 26-bay integrated open-air regional and intercity bus terminal and a six -level 377-space on-site parking garage.
  • Opening up of 64,000 square feet of leasable commercial space on the upper floors of the Terminal Building.

The project is scheduled for completion by fall 2016.

Aerial View Looking South Showing Terminal Building
Aerial View Looking East Showing Parking Garage and Bus Berths
Main Concourse
Office Space
Waiting Area
Tunnel
Platform

Springfield Union Station History

Springfield Union Station was building in 1926 as part of a series of civic buildings and spaces which help define central Springfield. The complex stands as a successor to three earlier stations on or near this spot on the north edge of downtown. From 1926 until after World War II, rail travel thrived and Springfield Union Station was the heart of a bustling district that included the North Blocks of downtown and the adjacent North End.

Springfield Union Station closed in the 1970's, a witness to the post-war ascendancy of the suburbs and the decline in intercity rail. In the decades since, the Main Street core south of the station has seen concerted public and private reinvestment, through new construction and extensive reuse of historic structures, as city leadership embraced a movement to reclaim the distinguished character of Springfield and preserve its heritage.










Construction This Week 8/24/2015 - 8/30/2015

Terminal Building
•    Structural demolition of interior
•    Structural demolition of roof

•    Removal of 1st floor west topping slab
•    Vehicle barrier on top of retaining wall
•    Canopy concrete foundations
•    Masonry - south side and light wells
•    Masonry - grouting of secondary window sills
•    Masonry - replacement of third floor window sills
•    Masonry - parapet work east elevation
•    Installation of new deck in abandoned head houses
•    Repair of Concourse window lintels
•    Grinding and painting of existing exterior lintels
•    Window blocking
•    Waterproofing of exterior west and north Terminal walls
•    Cleaning of Passenger Tunnel beams
•    Electrical - primary conduits interior

Exterior Site Work
•    Garden Brook - cut concrete top to top of base level
•    Frank B. Murray - Storm & Sewer drain manholes being installed
•    Sewer work in FB Murray, manholes and piping approved and on order
•    Cleaning and painting of Passenger Tunnel

Parking Garage

•    Parking Garage Cast in Place (CIP) concrete:  1st Placement
•    NEFCO back on site to cut more Pressure Injected Footings (PIFs) to grade